Bringing Value Engineering to the Table
What did we do?
Put the value in value engineering in the big blue box
Reduced overall cost of a new buildout
Utilized BIM technology to identify more efficient design strategies
Doubled the client’s savings goal by reducing prototype buildout costs by 8%
Some assembly required
Solutions
Architecture & Engineering
Used BIM technology to identify additional opportunities for more efficient design strategies
Construction Solutions
Used value engineering and cost estimating to streamline store layout and construction timeline